Activity Aims

  • To discover more about bridges and bridge building
  • To raise awareness of the profession of civil engineering and how this job role fits into the wider spectrum of construction and the built environment
  • To emphasise small group and teamwork, time management and working with limited resources

Activity Description

A simple bridge-building activity which highlights the different styles of bridges and focuses on the role of civil engineers
The bridges need to carry a weight and a small toy car.

Activity Length

Up to 2 hours. 

All timings given are approximate.

Audience

  • Ages 11–16
  • The extension ideas will make this activity more challenging and suitable for older audiences

Group Size

  • This activity is flexible based on the size of the audience however min 2 max 4 per group is ideal.

Remember the overall size of the group/audience involved may affect timings.

Further Information

For full details on the activity please see the Activity Cover sheet included in the documents below which provides information on:

  • Preparation and Resources required
  • Curriculum/Sector/Employability Skills links
  • Extension Activities